I had to buy a manual O-100 and add a DZ-1000
should be no issue
but it’s inconsistent on the through route..
the divergent track aligns with out fail.
On the bench, I’m getting power for the track and the DZ-1000 from the same source-A Z-1000
will I need separate power?
I usually run my Gargraves manual-
and my Auto-aligning turnouts are MTH.
So this is a new chapter in my train story.