Skip to main content

Back to 3 rail code 148 turnout. How I simplified and did it.

 

I was gonna tear out all 3 rail and go to RC across the board, but my final assessment was only to RC my 2 rail brass. I have a ton of money tied up in ERR Tmcc units.

Soooo, I had tried using N scale rail in the turnouts, but it created a lot of problems. This is a modified Atlas 7.5 code 148 turnout with 148 third rail. It works fine and smooth, but i'm going to down size to code 100 next. Here are 2 short phone videos of my super detailed 3 rail cab forward. Any jiggling is a function of the gauge and springing of the lead truck. 

Now added making the turnout.

 

Attachments

Videos (3)
sp cf 2
sp cf1
sp cf3
Last edited by Ron H
Original Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×