Skip to main content

Reply to "Future MTH 3-rail 2-rail Banned - Engine on Probation"

(Edit) Altering the original intent (2/3rail operation). .  You could reverse one axle on each truck to allow for pick-up from either outside rail via both trucks in the 3 rail mode.

Three rail only operation.

 

Would short the two rail mode.

Correction noted.    

Last edited by Mike CT

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×