Skip to main content

Reply to "Bascule Bridge #313"

On one side, all you need is the Fastrack to Tubular transition track. On the other side, I trimmed the edges of a transition track to fit into that end of the bridge. Here is a picture of that modification.

F5D5564A-4415-41BE-8802-2AC246C18600

Attachments

Images (1)
  • F5D5564A-4415-41BE-8802-2AC246C18600

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×