Skip to main content

Reply to "Bay Ridge Redevelopment."

OK the final photos of the backdrop before I move onto other work I added some foliage to break up the "sameness" of the fence line. This is where the redevelopment comes to a temporary halt as far as posting here on the Forum,  but in reality work is still going strong like I have finished all the ordering of what we need and I have removed everything from under the layout including shelves getting in preparation for the electrical work and the fitting of the switch machines. All the items I have ordered are coming from overseas so there will be a delay of between 14-21 days before anything arrives from The USA and England, in the meantime I will work on other projects and keep the layout up and running every Friday till I finally make the decision to shut down the layout for a few weeks I will still post here every few days  and let you know what's happening.

Bruce is working on the matrix modules for the interlocking on the Control Panel and the board has been ordered from the laser sign man I will show you this when it is delivered it's a larger board (A3 size) than we have on other parts of the layout (A4 size) as there are 15 turnouts, 4 Double slips, and 23 isolating sections lots of buttons and switches.    Roo.

 

DSC03805DSC03806DSC03807

Attachments

Images (3)
  • DSC03805
  • DSC03806
  • DSC03807
Last edited by Roo

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×