Skip to main content

Reply to "Bay Ridge Redevelopment."

BOBBYD. I was thinking about getting two of them and using them in the Gym for a workout! 

The progress on changing Bay Ridge yard is moving along slowly Bruce was under the layout today wiring some turnout motors we can still use this section I have laid down some temporary track to link the new finished sections with the present Yard. So one photo today shows the yard staged for this Friday running day.

I have always where possible tried to put everything under the layout on wheels which has paid off numerous times as far as my back goes and the ease of working under the layout here are some examples. The seat I bought from a boat place and put it on wheels.  Thanks again for dropping in Roo.

DSC04016DSC04015DSC04017DSC04018DSC04019DSC04020DSC04021

 

Attachments

Images (7)
  • DSC04016
  • DSC04015
  • DSC04017
  • DSC04018
  • DSC04019
  • DSC04020
  • DSC04021

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×