Skip to main content

Reply to "Been a long time, but finally motivated to get in gear UPDATE Shively yard is operational?"

Jeff, I'm glad you fellows got everything running!  I can't blame Dad.  It is tempting to move around once trains are running at speed, and you just want to get a different view or have a thought about checking something else.  That's one of the things I like about using a remote after probably 45 years running conventional.  That is a handsome control panel!  Did I miss something on how you made the panel front?  I see the photograph of the backside with the wiring on 12/6 and looked at the thread you linked about switches and indicator lights on 12/24, but didn't see how the front of the panel with the track plan was made.  I confess, I was too lazy to reread all your detailed descriptions; I just skimmed. 

I looked at your topic about the KW breaker.  The folks who replied made good suggestions.  It seems it must be something simple.

Oh!  One more thing.  Do I recall a mention that your dad has some buildings, maybe Plasticville?  What plans are there for scenery?

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×