Skip to main content

Reply to "Bench-work suggestions for Track over another track in a tunnel and Woodland Scenic for Modular."

I would recommend using 2" foam as a base instead of plywood since you are building a modular layout.  It's lighter, easier to work with, and is plenty strong enough to support trains.  You can use it for both levels (full disclosure - it's what I'm doing with mine which will be 20x20x4 around the room).   I would use 1" thick plywood for supports though - a littler stronger than the Woodland Scenic foam supports.   You can get away with placing them 12"-18" apart depending on the length of the run and other scenic considerations.   As for the risers, use them in conjunction with the incline/decline starters - they come in multiple heights so you can get whatever height you desire.  You may want to buy a second set with Fasttrack and place side-by-side - you may find a single set too narrow for your tastes. 

-Greg

 

Last edited by Greg Houser

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×