Except for decals I am pretty much done.
The first floor with the lights on (I am using Model Power LED 12- 16 volt - polarity required)
Second floor with the lights on
Whole building
The base fully populated. The aux tank, garbage cans and coke machine are not glued in.
I drilled holes in the sign posts and the roof so it will be easy for the customer to attach.
The hanging sign will be shipped separately.