The layout I am planning will have over 200 signals and I would like to have them operate with a rule set. Layout Command, LCC, will be used to detect train locations and do the logic for the block and dwarf signal. I will break each track block into 1-3 sections with for occupancy detection. My LCC track occupancy detector cost less than $1 plus my labor. The signal aspect control and logic will be done by a RR-CirKits (company) Signal Tower (product name). It will cost $4 for each signal LED. To reduce the signal costs the Yellow aspect will be controlled by a 2-NOR of the Red and Green signals. The chart shows my current thinking on the signal rules. I am open suggested changes in the rules. The checkered aspects are blinking.
Attachments
Original Post