Skip to main content

Reply to "Block System for new layout"

Hello Stan,

I do not seek a turnkey project.  I am fully capable of building this system with minimum assistance, once the concept we have identified has been further articulated into a plan; this includes the design, critical materials needed to build it, and build instructions.  

I realize there are numerous alternatives, but we need to settle on one.  This is been proposed, including the  signaling and control board components have been identified.  What remains is the block control concept which appears to be compatible with the control board.  If this is a workable solution in your professional opinion, can we move forward with the complete solution?

It seems to me we are relatively close.  If you are comfortable with the concept and action steps, can we move forward?  If not, let's try to identify the obstacles that remain and attempt to resolve them one at a time.

Thanks again for your thoughts and effort.

 

Ray

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×