Skip to main content

Reply to ""Breaking In" Rails"

Just so we’re all on the same switch list here, this “break in” policy has very little to do with the rails themselves.

This “break in” procedure involves the entire track structure; rails, ties, ballast and sub-grade. How long it takes to get back to full track speed would depend on how much work was done to the ties, ballast and sub-grade. It takes some time and a lot of tons passing over the track for things to “settle in” as the PR release says.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×