Skip to main content

Reply to "Bridge too low for CSX trains in Delaware"

Gene posted:

All RR measurements are from top of rail.

I worked for a construction contractor as their PR guy for a large project that involved removal of railroad tracks. I've never heard of elevations for RR tracks being the tops of the rails and was told they measured it from the top of the actual permanent grade itself and not the top of the rails, as everything else could change with simple track work or replacing the rails with different sizes.