Interesting. You think if real railroads could lay track and then have the terrain appear would choose to do it the way they have too? They'd choose our way. The challenge is operations. Laying track, wiring, switches, etc. is challenging enough to get aligned and tracking properly without having to simulate cuts and fills, blasting, tunnel boring, etc.
|