Skip to main content

Reply to "Building this layout - any revisions or advice? Ross switches and GG track"

baildas

Three switches are needed.  I had two, the two on the bottom already in place as part of the outside loop in the second picture where the tools are.  The third is a new switch at the top of triangle.  Then I had to add a second switch to make the triangle and to replace the curve track of the outer loop that was in the way.   The cattle corral had to be moved and made narrower to fit in its new location.

The picture below shows what I had to start with.  The Wye will where the yellow and green cattle corral is next to the gray and orange Ice station.

 

Train Overhead views 9-21-016 2016-09-21 019

Charlie

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×