Skip to main content

Reply to "Building “Up!” On the Layout: 7 March 2021 Update - House Floating & Overhead Cloud added!"

A little more progress on the Up house...



First, I added some floor “joists” and pipes using scrap wood pieces, plastic sprues, and pieces of metal coat hanger.

0B0BDB99-FA8D-44B9-802F-478ECF3D924B
Here the pipes are lightly weathered:

ED55A84F-188C-4388-93A8-D455EABB92B9

I also added some electrical/water meter boxes to the side of the house, as per prototype (or close enough, anyway):

F34D1E1D-6AAD-4A1E-AD42-71ACFC3BB5C3

Finally, I reinstalled the now blue balloons and formed the balloon bunches into a single bouquet of 200 mini balloons:

0B9A0F0D-2F19-46CB-990A-35FDC085A3BA

200 balloons is far short of the thousands required, but at least gives the impression of the bottom portion of the balloon bunch:

1A47D41D-EB9A-4296-9164-3D84A448A7C3

More to come!

Attachments

Images (5)
  • 0B0BDB99-FA8D-44B9-802F-478ECF3D924B
  • ED55A84F-188C-4388-93A8-D455EABB92B9
  • F34D1E1D-6AAD-4A1E-AD42-71ACFC3BB5C3
  • 0B9A0F0D-2F19-46CB-990A-35FDC085A3BA
  • 1A47D41D-EB9A-4296-9164-3D84A448A7C3

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×