Skip to main content

Reply to "Buy/Make Anything Cool Lately (Tinplate Version)"

Rich Wiemann posted:

Bob thanks for your insights. I will definitely plan on adding the switches to the figure eight. I had thought about making an elevated trestle line but not a full platform...interesting. That would allow for adding STD switches and a side line. Feedback on if the platform should be open for line of sight to the back side? I was thinking of placing a Lionel 101/102 bridge and ramp there opposite the Hells gate. Or cover the gap as a mountain side with portals for the standard to cross over?

Rich, 

For O gauge switches, I found Merkur to be the smoothest running for tinplate. Here's a discussion on them: https://ogrforum.ogaugerr.com/...kur-trains-and-track

For STD gauge switches, Ross seems to be the winner. That is what the SGMA uses. I have seen them in operation at Train Fest and plan on using them on my upcoming layout.

George

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×