Skip to main content

Reply to "Building my Ceiling Layout (6.11.21 Update)"

After the floor radius testing, it was time to start putting up some of the brackets so I did 6 of them one side.

Watching some Below Deck: Thailand on Bravo Channel with my wife.  (I used the hammer drill into the wall during the commercials )

20200314_20062620200314_200707

A view with the wood shelf (I will eventually paint these white)20200314_200739

And then with the MDF shelf.  These are way too heavy so will not be the final choice.20200314_20081420200314_20082420200314_200837

And then did a photo shoot with the track and two train cars for a visual of what it will look like20200314_20304420200314_20311020200314_20311220200314_20311820200314_20453220200314_20454620200314_20463020200314_20463820200314_204647

This view is from the south wall.  Directly overhead is where I want to place a bridge with at least a 24 inch span.  I don't think my desire to use a MTH double track arch bridge will come to fruition as the height of the bridge arch is too high to fit the clearance space between the shelf and the ceiling.  Disappointed as the goal of the bridge span for me was to (1) have it be the centerpiece display facing the rest of the living area and (2) have the trains running overhead with a clearer view of the underside of the train as it runs by.  

20200314_204712

 

 

 

Attachments

Images (16)
  • 20200314_200626
  • 20200314_200707
  • 20200314_200739
  • 20200314_200814
  • 20200314_200824
  • 20200314_200837
  • 20200314_203044
  • 20200314_203110
  • 20200314_203112
  • 20200314_203118
  • 20200314_204532
  • 20200314_204546
  • 20200314_204630
  • 20200314_204638
  • 20200314_204647
  • 20200314_204712

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×