Skip to main content

Reply to "Building my Ceiling Layout (6.11.21 Update)"

Did you consider running two parallel tracks? From everything that I read, i may have to scrap mu fasttrack and move to Atlas. Bums me out, I have a small fortune invested in Fasttrack and switches.

Good morning George and thanks for your inquiry.

I do run a set of parallel tracks. Originally it was 2 runs of O with O-63 (Inner Loop) and O-72 (Outer Loop) Atlas track. I have since replaced the Inner Loop with Kato HO Unitrack (31-1/8" radius aka 62-1/4" diameter) so that I can run my HO trains.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×