Skip to main content

Reply to "New expanded NorthWest Minnesota RR: Video and 3D! From the Chippewa Central 6' x 16' Fastrack Layout Plan from MR"

I thought about extending the connecting RR at the top of the plan, around for an oval of O-72, and going across Lionel's Lift-Out Extended Truss Bridges (with a staging track or passing track).   So here is an unfinished look:  6'6" x 17':

So this will support 4 trains, with three running trading places with one on the siding over the truss bridge at the front.   The middle semi-circle of track on the right is on a fill, rising from about 3" to 6" at the bridge over Granite Falls.

M716-01-Chippewa-Central-V1f

Attachments

Images (1)
  • M716-01-Chippewa-Central-V1f
Last edited by Ken-Oscale

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×