The Chippewa Central plan needs these turnouts for estimating overall costs:
- 6-16826, 0 Lionel FasTrack, Left turnout 14 1/4". (O72) Command Control 1
- 6-16827, 0 Lionel FasTrack, Right turnout 14 1/4". (O72) Command Control 1
- 6-16828, 0 Lionel FasTrack, Left turnout 13 1/8". (O60) Command Control 7
- 6-16829, 0 Lionel FasTrack, Right turnout 13 1/8". (O60) Command Control 8
- The two Lionel Extended Truss Bridges are also a cost item ($300 MSRP each).
Naturally, it could be built in phases to spread out the cost and effort:
- Outside loop & turnouts, with one bridge
- Inside loop and Granite Falls
- Clara City elevated loop and grade up
- Passing track with 2nd Extended Truss Bridge
Even though the minimum curvature is O-48, I like that the turnouts are one width wider at O-60.