Skip to main content

Reply to "Christmas 2020 build - add your pictures if you like!"

Finally, both half's attached and the track moved back to the base.

PXL_20201130_133930374.MP

PXL_20201130_133953352.MP

Here is a close up of the seam between the two halves. You can see the staples. After the season is over (or if I get bored) I'll add some fingernail polish of the same shade to the staples to hide them better. I will also add the switch wiring under the board (you can see it on-top in the upper pictures). I have not screwed down the track yet as I have a short in one of the switches. It is receiving power on the auto-derail switch leg and not allowing the auto-derail to function on the straight leg. Once I solve that, I'll screw down the track and add the village (more picture to come).

PXL_20201130_134009044.MP

Attachments

Images (3)
  • PXL_20201130_133930374.MP
  • PXL_20201130_133953352.MP
  • PXL_20201130_134009044.MP

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×