Skip to main content

Reply to "Cleaning G Scale Track"

Thanks for the response Joe!


I don’t use screw rail joiners, so I was thinking the rail joiner clips were also getting cleaned when submerged to help reduce voltage drops from poor connections with them.  I wasn’t excited on having to do multiple track feeds on temporary layouts if they were bigger, currently have this set up going on with standard dc power.

IMG_9137

Attachments

Images (1)
  • IMG_9137

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×