Skip to main content

Reply to "CNJ Heavy Mike project"

Hopefully I'll get an updated photo either tonight or tomorrow. Had to fill the seam above where the firebox starts, it's about 1/8" off from where the band at the top of the firebox falls.

CNJ used 2 single stage air pumps instead of a cross-compound unit (which the original model had). Had these made on shapeways, turned out cheaper than getting them from Precision Brass, and they're more detailed. Hard to get the detail to show up in a photo since they're made from clear plastic. 

20200613_133102

Attachments

Images (1)
  • 20200613_133102
Last edited by Magicland

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×