Minor progress made. Bands between boiler sections replace/added, holes drilled for and pressure reliefs and boiler steps replaced. Holes drilled for some plumbing, routes marked for the others that I need to run before replacing the firebox section running boards. Up next, running that plumbing and fabbing a mount for the generator, then re-attaching the firebox section running boards, as well as drilling the holes for the handrail stanchions (also hopefully finding the one that ended up on the kitchen floor when I removed them, or finding a replacement).
|