Skip to main content

Reply to "CNJ Heavy Mike project"

Minor progress made. Bands between boiler sections replace/added, holes drilled for and pressure reliefs and boiler steps replaced. Holes drilled for some plumbing, routes marked for the others that I need to run before replacing the firebox section running boards. Up next, running that plumbing and fabbing a mount for the generator, then re-attaching the firebox section running boards, as well as drilling the holes for the handrail stanchions (also hopefully finding the one that ended up on the kitchen floor when I removed them, or finding a replacement).

20200614_232900

Attachments

Images (1)
  • 20200614_232900

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×