Picked up an AC Commander for my Metroliner, hoping to get that put in this weekend. Was supposed to be delivered Monday, just showed up today. Thanks USPS! Meanwhile, I've begun removing bits from the tender that didn't need to be there. Cast ladder on the wrong side, faux grab irons and back-up light are gone, as well as the longitudinal water hatch which was cast on the top. Fish-belly I beams are in the process of being constructed. I'll design and print the correct water hatch later tonight. I've begun the arduous task of removing the fake coal load, but I have to pause periodically to let the dremel cool off.
Proto water hatch to test for fitment. Made the final one narrower (front to back), added detail on handles and hinges. Metal has been filled and sanded. Coal load is more than half cut. Once it's out, I'll attach the hatch, and hit with some primer so I can see areas which need further work.
Ladder prototype checked for fitment. A few more details and it's ready.