Instead of painting my coal tower I covered it with Polystyrene added a new roof and a transfer building to load my coal trucks. My coal operation starts on my second level by dumping coal into a shoot to the coaling tower. the tower loads up the coal and dumps it on the lower level. Two HO switchers, one empty and one full go in and out of the coal mine.