Skip to main content

Reply to "Continuing Saga …"

It's been a hoot! And yes, it's sure getting closer. Today, in between making braised short ribs, I removed the masking sheets, cut off any overlaying plaster and then painted any exposed areas with W-S Earth Tinting coat. I then went back and added additional ground cover, did some trimming of the road surface which was now hard as a rock, and did the first coat of W-S Concrete color on the sidewalks after I scribed some crude expansion strips in them.

I was a little sloppy doing the touch up, but will go back when all is dry and back paint the wall color down to the earth line. I also have a couple of "ground hog" holes that lead under the building perimeter that I'll touch up.

EH Ground Cover Round 2

I still have more work to do on the drive/parking lot and will get to that tomorrow. I'm then going to add more vegetation at the building/ground juncture. The scheme I used of wrapping with the Stretch-n-Seal and then plastering right up to the edge worked perfectly. I was still able to lift the entire building to pull out the mask and when it set back down it snuggled right in. There's almost no gaps anywhere and the building looks like it was planted there.

EH Ground Cover Round 2 1

Attachments

Images (2)
  • EH Ground Cover Round 2
  • EH Ground Cover Round 2 1

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×