This is last night's post! I forgot to press "POST" and it just sat there. And then all the images time out and I just had to reload all of them. After this I'm posting today's work.

Mansard roof is about 99% complete. I just have to do some internal relieving to clear some of the newly re-routed wiring. Got the shingling done, put on the drip edge, painted the blue trim and re-painted the NATO black and installed the upper roof and Turret.

After finishing up the shingles on that one window, I went around and reinforced the upper trim edges with some UV-cured Bondic and then trimmed any excess. I put the ridge shingles on all the corners after carefully applied some PSA to reinforce this particular shingling job. They're under some tension and the self-stick adhesive has been letting go.

I then appied the 1/16" square stripwood drip edge around the perimeter of the Mansard roof. I first checked to see if I could get the turret into position with the edging in place. I was, so I glued in the edging in that front space.

HBTRR Drip Edge Installed

When the glue dried enough so the strips didn't fall off, I brush painted the edging and underneath the eaves. I could be sloppy since I was going to go back with the NATO black and back-paint to the edging.

HBTRR Mansard Base Painted Blue

When I put on the black it quickly started dissolving the blue which wasn't totally cured at all. To keep my progress going I overcoated the blue in the gutter area with Dullcoat. This image was while the Dullcoat was drying. This sealed the blue and enabled me to do the black in the same work session. As I've said many times before, "I am NOT patient, I am persistent!" When I screw up it because rushing either paint or glue before it's dried.

HBTRR Dullcoat Seal Prior to touch up

In addition to painting the gutters, I went into the window areas and did some final touchup there too.

After painting the black touchup, the roof was pretty much done.

I needed to get the attic stair rail installed before putting on the top roof. This was not difficult and after a little trimming, I got it glued in place.

HBTRR Attic Rail Installed

Then things got a little bit sideways. I went to install the cupola and found that the rear-most corbels impinged on the Mansard roof and it was preventing the turret from seating properly. The back corbels would have been imbedded in the roof and wouldn't have been seen, so I broke them off.

The second thing that happened was I was no longer able to get the top roof on. It was blocked in two ways. First the chimneys prevented sliding the upper roof forward so it slipped under the turret roof. I had to remove the turret which I had just glued in place. Luckily, I used Aleen's PVA instead of CA. It wasn't yet cured so the turret came off easily.

And then problem number two reared its head. I couldn't drop the roof over the chimneys. I could get one notch in on one side, but then it looked like this.

HBTRR Roof Install Problem

First I thought all I needed to do was make the relief slots deeper and I did this.

HBTRR Chimney Slot Deepened

But then I found that at least on side had to be wider to drop over the chimney's width. So more surgery and I did this.

HBTRR Chimney Slot Widened

I had to re-attach the LED leads whose copper foil had failed, and realized that these leads needed to join the leads from the 2nd floor ceiling that were going down through the back-center (un-windowed) room. I was going to bring them down through the turret joining the non-polarized leads from the grain of wheat bulb in the cupola. That really wasn't the best route. I re-routed the attic leads backwards across the attic ceilig and camoflaged the leads with white duct tape, and then drilled a hole in the rear of the attic floor to pass the leads through. I had to made more clearance in that front beam where the wires go over it. And I will also have to cut some relief in one of the attic partitions since the wires back there are holding the roof from setting down correctly. But other than that, the entire upper works are finished! This was the most complex part of the project and I'm happy that it's now in the rearview mirror.

HBTRR Upper Works 99 percent

The touchup painting really tightened up the total deal. After gluing down the upper roof I'll have to flash around the chimney notches and maybe build a TV antenna... although I haven't printed a TV for the interior. I can... I printed two versions of 1950s TVs for the Appliance Shop.

I tested the lighting and took a picture through one of the windows. It looks pretty.... atticky... if there's such a word.

HBTRR Attic View w Lights

I'll finish up all these odds and ends tomorrow and then get cracking on finishing up the main building. If I need to produce a TV I better do it soon since the furniture's going in and then it's going to be closed up. I have to paint the exterior walls and do all that detail painting for the stone foundation. I'm going to join all the various parallel circuits in the stone base so only one set of leads goes below the table level.

Attachments

Images (9)
  • HBTRR Drip Edge Installed
  • HBTRR Mansard Base Painted Blue
  • HBTRR Dullcoat Seal Prior to touch up
  • HBTRR Attic Rail Installed
  • HBTRR Roof Install Problem
  • HBTRR Chimney Slot Deepened
  • HBTRR Chimney Slot Widened
  • HBTRR Upper Works 99 percent
  • HBTRR Attic View w Lights
Last edited by Trainman2001

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×