Skip to main content

Reply to "Continuing Saga … Under-Construction Rick House (Bourbon Aging House) FINISHED (not on layout yet)"

Couldn't leave well enough alone so I did some weathering on the deck plate and one of the deck truss bridges. The other truss I just added some dark powder to the horizontal upward facing surfaces. My thinking is that this bridge was recently repainted and its sister bridge is waiting for that. The deck plate is much more interesting with some weathering. 

 Deck Plate Weathered 1

Deck Plate Weathered 2

I used a 50/50 mixture of artist acrylics: Raw Umber and Raw Sienna to make the intense rust spots, then I went over it with rust and grimy black colored Dr. Brown's weathering powders. I may still have to shoot some Dullcoat to kill the shine of the acrylic. I learned about the acrylic in a weathering video on YouTube.

 

While this was all drying, I went to work removing one of the temporary planks and fitting a deck truss bridge into position. I was rewarded in that it came out very easily. I didn't use to too much Liquid Nails holding the track in place since I knew it was coming out eventually. I used the Dremel with a cut off wheel and the flex shaft extension to cut the track and the roadbed right at the joint. This plank was pre-sized for the bridges that I bought so the bridge just dropped in. 

 

Truss install 02

This outer bridge is a on a 2º slope and it's set up automatically by fastening the bridge to the subroadbed one each side rather than attempting to accurately size the abutments. They'll just be for show. It works out that a piece of 1 X 2 and one piece of cardboard spaces the bridge to track height perfectly. Using some clamps and scrap wood on each end, the bridge sits in its final position.

 

These pictures are close ups of the temp supports at either end. The cable tie is holding the bridge firmly to the piece of track so I could get a good idea of the spacing requirement. 

 

Truss install 01

Truss install 04

I will need to put a spacer block in the end with the stub track to provide a foundation for the ballast that was on the temporary plank. I will also properly size the abutment blocks so they'll blend properly into the false work that will cascade down the sides of the ravine the bridges are crossing. The installation for the other truss bridge will be exactly the same except for the little piece of curved track that will come over the right-hand end.

 

Looking at it from this angle, having real bridges on the layout really works for me. I was going to wait awhile before the bridge building project since I was a little intimidated by the whole thing and was procrastinating. I'm glad I just dove into it. The railroad is much better off because of it. 

 

Truss Install 03

 

That pole sticking up on the left side of this picture is the vertical hanger support from my Dremel and the flexi-shaft.

Attachments

Images (6)
  • Deck Plate Weathered 2
  • Deck Plate Weathered 1
  • Truss install 02
  • Truss install 01
  • Truss install 04
  • Truss Install 03
Last edited by Trainman2001
OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
330-757-3020

www.ogaugerr.com
×
×
×
×
×