Skip to main content

Reply to "Continuing Saga …"

Started to build the scenic structures in Ravine 1. I'm using a multi-media approach; combining cardboard strips, Styrofoam Bead Board, plaster cloth, plaster impregnated paper towels, Sculpt-a-Mold, plaster rock castings and various kinds of fillers to create the topography.

 

First challenge was to fill a large gap between the screen wire and the foreground bridge abutment's edge. I'm using bead board held together and to the layout using W-S low temp foam hot glue. It will support NO loads and just has be stable enough to hold in place while the plaster cloth hardens that will be attached to its surface. Running down the front will be the false concrete bridge abutment that will blend into the ravine's face. 

 Ravine 1 scenic 04

I also started to fill in the sides and the between-the-tracks area in this area of the layout. I did this will cardboard strips attached to sub-roadbed edges and/or joists using normal-temp hot glue. Again, these will be covered with plaster cloth, filler and rock molds, before ground cover and vegetation.  

 Ravine 1 scenic 03

I was only in the basement for less than 2 hours. There's lots more to do here. Perhaps today...

Attachments

Images (2)
  • Ravine 1 scenic 04
  • Ravine 1 scenic 03
Last edited by Trainman2001

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×