Skip to main content

Reply to "Continuing Saga …"

Those rocks are terrific and inspiring. I will consider doing a 'multi-media' rock job. I did a lot more plaster-paper-towel work today, and it sure is messy. I modified the method just a bit since I was consuming plaster at a ferocious rate by squeegying the excess plaster off back into the reservoir. This gave me a little more mileage. I have one more day of the rough layering and then I'll start the detail layering.

 

Terrain 06

I wised up this time and covered masked the track and covered the floor with newspaper. This is after I made a royal mess on the first terrain that I did. I am hoping that the splatters on the floor will come off with a wet mop. I will touch up the track and ballast when it's all done.

 

Here's some of the mess. Yuck!

 

Terrain 08

 

I will have to get some more Masonite to make the framing around the ravines before I can fully plaster them. I'll be getting that some time this week.

Attachments

Images (2)
  • Terrain 06
  • Terrain 08

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×