Skip to main content

Reply to "Continuing Saga …"

Plastering, more plastering!

 

I finished Ravine #2 with STM, and also the layout edges on the far left end. I added some "occasional" rocks to one of the them since there was a depression that was just calling for rocks.

  

Terrain 22

 

I had some STM left over and there was a big gouge out of the one of the foam faux bridge abutments, so I decided to fill it. But first I had to stick some toothpicks into it to provide some for the plaster to grab onto. I should have trimmed them so they be below the plaster surface BEFORE I put on the plaster. Instead, it was very difficult to work it in properly until I took my Xuron cutters and chopped them down a bit.

 

Foam Damage

 

Here's the patch. This isn't the end. The entire abutment gets a coat of patching plaster to give it a smooth finish. The gouge will then be gone.

 

Foam Fix

 

Until next time...

Attachments

Images (3)
  • Terrain 22
  • Foam Damage
  • Foam Fix
Last edited by Trainman2001

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×