Skip to main content

Reply to "Continuing Saga …"

I know exactly what you are going through, I  had a way different design in my head before my mountain was done.  My problem was to drop the track one foot at a 4% grade. That is about 25 feet of track on a small table with a 48 inch curve..

I also had a much longer tunnel to start with, then my wife said "who is going to see the train in a tunnel?" A good point so I made it way shorter... Maybe you need to talk to your wife? :-)

 

 

 

 

Attachments

Images (1)
  • plater work

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×