Skip to main content

Reply to "Continuing Saga …"

Did some errands today so only had an hour to work on Bernheim II, got more windows installed. Clearly, I hadn't adjusted the sizing on ALL the windows and some were falling through the openings so I had to glue some small strips of excess laser board to act as a stop and a gluing surface on several of them. I bought a 2 foot square piece of ply with an oak finish to act as the base board. I'm going to mount the model on a bias so it's a bit more interesting. The base will be landscaped similarly to how I did the one on my layout, but with a little more care.

IMG_0194

I have a few more windows to do, then I'll put the lighting into the 2nd floor and put the floors in place. Then I'll install the roof truss supports and the trusses and put in the 2nd floor lighting. and we'll be ready for the roofs to go on. It takes a long to put on the Rusty Stump shingles as it would to shingle a real house.

Attachments

Images (1)
  • IMG_0194

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×