Skip to main content

Reply to "Continuing Saga …"

That's nice to know about living with AFib. So far, with the meds, I really don't know I have it unless I feel my pulse.  Mark, I thought it was "halter" monitor too for the same reason you did. I had one years ago and it was a big clunge. I'm glad they've shrunken down.

If I hadn't glued the front roofs on, I could have simply cut off the material to make them match the rear. Much easier than stretching a board. But, they not only glued in, the clerestory walls are glued to them and press down on them. I'd have to practically destroy the model to "fix" it.

This distillery is not going on my layout. I already have one. This one's for the Heaven Hills Distilleries' Evan Williams Bourbon Experience, a tourist attraction on Main Street in Downtown, L'ville. They liked the one I built for my layout so much they asked if I could build one for them.

I fixed the short main roof, but it wasn't a perfect solution. I was able to separate the "tar paper" from the Masonite substrate since it was held with PSA. I was then able to slide the upper part of the new shingles under and make the shingles look correct... sort of. For the extension I used some 1/16" ply strip CA'd to the eaves edge of the roof. I applied the shingles to this piece first, slide the adhesive shingle upper edge under the tar paper and then pressed the shingles to adhere them to the Masonite. I then used Formula 560 PVA to re-glue the tar paper to the new shingles. 

Added Roof Bottom

The problem was that the tar paper made added thickness to the shingles at that point and resulting in a little step in the roofing. This step is a bit unsightly so I decided to disguise it a little bit with some pieces of 1/16" brass angle to serve as ice dams. It keeps you from noticing the step as much. Sort of "Misdirection".

Added Roof

I ran out of brass so the front roof got less pieces. I rationalized that the roof is smaller and needs less of them. If I can get more brass, I'll fill them out a bit. My LHS did not have that size in stock.

Sno Bunnies 2Me gutter brass arrived from Special Shapes so I'll be making gutters and downspouts tomorrow. Meanwhile, I finished the parapet caps by first air brushing them with Model Flex concrete and then cutting, fitting and gluing them to the wall tops with Aleen's Tacky Glue. They really dress up the building and give it a finished look. The stacks are just fitted for this image. I drilled the tall stack in 3 places and installed brass eyes to attach the E-Z Line guy wires.

Cap Strips In

I prepared the big  "Berheim Bros." lettering. It's laser cut laser board held into the fret with tiny nibs. I wanted to be sure to hold everything in registration so here was the sequence.

First, tape the back with some wide blue tape. I then popped out all the letters that were now supported on the tape. This tape was adhered to my painting board and I used Tamiya Primer and flat white to paint the letters. This permitted the edges to be painted. If I painted them in the fret, the edges might be left bare.

Signage Painted

This was allowed to dry overnight and then today, I used Tamiya wide masking tape and attached it to the front. Carefully I pulled the blue tape off the back leaving the letters attached by the front still maintaining all the correct positioning.

I turned to over and sprayed the back with 3M 99 High Strength spray adhesive.

Letter Adhesive

Lastly, I again turn it over and press the whole deal to the building, making sure to press the letter firmly to set them to the wall and carefully pull the Tamiya tape while using a probe to press the letters to the wall. After a little clean up, the letters are firmly attached. When I did this the last time on the first distillery the paint didn't adhere well to the laser board and it pulled off in some places when I took off the top tape. The substrate must have not been clean. This time, I used the primer first and gave it more time to dry. None of the paint peeled.

Lettering Applied

01 Original Berheim Bros Distillery

When I got ready to do the same routine on the smaller "Registered Distillery No. 9" signage, I couldn't find them. I don't think they got cut. I found an older set that was cut out of 1/32" ply, but I lost a "D" and had to try and make one by hand. Not so hot. And they're overly thick and have a lot of wood grain. I'm going to get them cut locally or have Andre cut them ASAP. Meanwhile, I have a lot to do on the base, build the shed roof and make the gutters, so if it takes some time to re-cut them, I'll be okay. I bought materials for the shed. It will be styrene like the one I made for my own RR. I have drawing to have these parts laser cut also, but chose not to worry about it at this time.

 

Attachments

Images (8)
  • Added Roof Bottom
  • Added Roof
  • Sno Bunnies 2
  • Cap Strips In
  • Signage Painted
  • Letter Adhesive
  • Lettering Applied
  • 01 Original Berheim Bros Distillery

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×