Skip to main content

Reply to "Continuing Saga …"

Pat, glad your flu is gone and didn't lead to anything else. Thanks for the remarks and following all this stuff.

Got the second coats of paint on the shed and started landscaping the base. All the while I cast the rest of footings. 

The roof is a base coat of rust red and then Dark Iron. The wood work is Tamiya flat brown. Tomorrow, I'll lightly abrade the dark iron to bring up some of the rust. I will alcohol was the wood. Then I do some rust work on the exposed NBWs and do some weathering power work. By that time, all the footings will be fully cured and I'll finish them up and install them. I sanded and trued up all the ones that had cured from the last two days pours.

Shed 2nd Paint Step

Before laying down any Sculptamold I needed to mask the areas where the building was going to set. With a smaller structure that weighed less I would have applied food wrap under the building and put the plaster right up to it. But this building is heavy and a bit dedicate so I made place holders instead (like I did with the boiler house). I traced the profile onto some cardboard and cut out the pieces. 

I also made a 0.040" Styrene sidewalk with scribed expansion lines and some scribed cracks. This two was traced to make a cardboard template. These pieces were affixed to the base board with some 3M77 spray adhesive. This was just needed to hold down the edges so the SM wouldn't creep underneath.

Landscape template

I masked the RR track and got the SM ready to apply by adding some W-S Earth Color Tinting to make it less white. I then slathered a layer over the entire board and got it into all the ties. Before it set up hard, I pried the templates out since I didn't want them to be hardened onto the board which could have risked popping the plaster loose. When I pulled it off, the edges were pretty clean. I tested the sidewalk and it fit nicely. When I do the ground cover it should be a pretty clean installation. The edges are slightly raised which I'll knock down with the sanding stick when fully hard. You can also see that I smushed the shed into the wet plaster to denote where the footings are going to be. I then took a footing and smashed the plaster some more so it will be easier to embed the footings into the "ground". The rectangular hole in the base is the passthrough for the AC converter that's attached to the building.

SM Applied

The plaster is relatively thin and should be dry tomorrow so I can start ground cover. At least that's the plan. Tomorrow is also my 48th Anniversary and we're having a special dinner out at Mesh in Louisville.

Attachments

Images (3)
  • Shed 2nd Paint Step
  • Landscape template
  • SM Applied

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×