Skip to main content

Reply to "Continuing Saga …"

Finished painting the shed and cleaned up, painted and installed the concrete footings. I spent the rest of the day cleaning plaster off the track and cleaning up the edges next to where the buildings were going to go. I painted the styrene sidewalk too. On Monday I'll treat it to bring out the expansion joints and cracks.

The Sculptamold (SM) takes a long time to dry especially when air can't get to the backside. It's been 24 hours and there are still areas that are wet and too soft to really work with. I shouldn't have bothered to paint the rails since almost all the paint has been removed in the process of cleaning off the excess plaster. When all is fully dry I will re-spray the rails. The footings' holes are a little big and I'll probably use some filler to close it up a bit. I was going to sand off the dark iron color to reveal the rust base coat, but as soon as I tried it, the paint came off the standing ribs down to the styrene white, so I stopped and added rust weathering powder to the surface. If it was a flat surface, it wouldn't have been a problem.

Shed Finished

I need to some research on how to landscape buried spur tracks since I'm not actually sure what to do next and this detail is front and center on the finished diorama. Any suggestions? You can see the wet areas of the SM. By the end of the weekend, they will all be dry and ready for paint and ground cover. Have a nice weekend!

Attachments

Images (1)
  • Shed Finished
Last edited by Trainman2001

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×