With the little time I had today I continued building pump stations. I got three complete and one more than half leaving only one more set to finish them up. The last set has a different configuration according to the plot plan.

I'm getting sort of an assembly line working here. I'm doing the drilling before the motors go on the base so I can clamp the pumps more effectively in the drill press. I measured all the pipe pieces and cut them ahead. I've standardized on the exact placement of the pumps on their bases and the bases on the base board. There's not specifics about how this should be done, but, you need to have them parallel and at the same edge or the piping goes in out of square. I'm also short of check valves and will make some out of standard valves.

IMG_0558Pump Progress

I have a few odd-sized pieces of OSB and found enough that I can puzzle together to make the base for the entire refinery complex. It will consist of four pieces all joined together. That was a big relief since I didn't want to have to buy another 4 X 8 sheet which I would only use about 1/3. I'm running out of things to build with OSB. It's a little bit of overkill to use it for a spray booth. I'll do the cutting some day when #1 is out of the house since the circular and saber saws raise on heck of a ruckus. I use 3M sound deadening ear muffs, but upstairs doesn't have that.

Attachments

Images (2)
  • IMG_0558
  • Pump Progress

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×