Well... here's the OSB in action.

With #1 out today, I had the perfect opportunity to make some sawdust and make lots of noise with the circular and saber saws, plus let's not forget the shop vac. I got the entire baseplate built and fitted.

The puzzle is made up of 8 pieces with lots of scrap OSB plates and screws (1 1/8" SPAX TORX Head). I swear by those screws, originally sold in Germany and now in selected Home Depots. They're the best self-threading wood screws I've used. The shank above the threads is narrower than the threads so once the screw penetrates the first piece, it's able to freewheel so it can pull the attached piece more tightly without having to strip the threads in the top piece. Even with that, I drill pilot holes since it's easier to drive them when you need a free hand to stabilize the drill/driver.

Here's the array of scrap OSB all screwed together to make a big sheet.

Baseplate Puzzle

I added some cleats on the layout edge to support that side so I could try in on for size and see how it worked. I added another couple pieces in the forward edge (as in this image) to give enough space for a parking area, flare tower etc. I'm also leaving real estate in back for more stuff. At first I was going to trim that off closer to the drawing, but had second thoughts and realized that this extra space will come in handy.

Baseplate fitting 1

I rounded the edges and will form a nice S-curve with the fascia on the far side so it will look more finished.

Final Fit

You can see in the above that I've added the extension joists. I cut them long enough to extend all the way into the layout to lie on the rear girder. They're pretty cantilevered, extending out about 2 feet. If this proves a problem, I might add a leg and some underpinnings to support the overhang. It only has to support a plastic model, not trains, but it may have to support a human (me) when I'm installing all the stuff or attempting to reach a train that's derailed. There is a switch back there that's hard to visualize from the control panel and I've had derailments there. The switch sometimes doesn't fully cycle. I've doubled the new joists next to the existing ones. If I need to, I can screw them together which greatly increases the holding power since these are all networked together through the large piece of OSB subroadbed above. There are at least 8 risers and cleats holding onto that OSB. As I write this, I'm probably going to do just that. I trimmed the joists so their ends are flush with the baseplate which greatly facilitates screwing on the fascia board.

Refinery Joists

This work really shows off the benefits of L-girder. Adding more benchwork is easy since everything is so open. Furthermore, there's nothing blocking getting wiring from one place to another. There will be lots of lights in this project since there are lights almost everywhere since it's a 24/7 operation (except in July when there's a 2 week turnaround). Monday, I'll get the risers made and installed. I don't think I'm going to mount the models directly on the OSB, since it will be unwieldy to attach all the stuff and get it to the layout. I may build the refinery on some Masonite or other thinner material and move it to the baseplate in sections. Just thinking out loud here. Perhaps Al, or other refinery builders can add to this discussion.

With this benchwork, there are now no open spaces on the layout. It was by design that a refinery was going there, and not knowing how wide it would be, I held off adding OSB until I had a plan to go by. I'm going to be very happy when the fascia is continuous from one end to the other.

Attachments

Images (4)
  • Baseplate Puzzle
  • Baseplate fitting 1
  • Final Fit
  • Refinery Joists

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×