Skip to main content

Reply to "Continuing Saga …"

Max, it's too bad you're so faaaaarrrrrrrrr away, but at least we have the forum.

Today was a car repair/haircut day so I had only minutes in the shop, but I got the concrete base put together.

Cooling Tower Pedestal 3

I cleaned up the stacks before CAing them to the Masonite. As you can see, I exchanged the warped ply for some flat Masonite. 

I just dropped the housing on the base for this picture. The height will work. It will look so much better when painted.

Cooling Tower Pedestal 2

During my errands I stopped at Jo-Ann Fabrics to look for Bridal tulle for the chain link fencing AND the screening in front of the cooling tower. This was the single, least expensive purchase I have ever made for my railroad. $0.70. Yes! That right! 70 cents! I'm going to layer the black tulle to make the cooling tower screening a bit more opaque. I was able to find the same size gauze as Brennen used in the original chain link fence kit. The lady could sell me as small a strip as 1" as long as it was the width of the fabric roll (54")

Chain Link and Screen

Tomorrow work will continue on this project and I'll have to order some vertical ladders or... perhaps I can build them as I did for the substation. It's not that hard. A bit painstaking, but it's a straight forward construction job. I will have to scale it carefully so it will fit the Plastruct ladder cage.

 

Attachments

Images (3)
  • Cooling Tower Pedestal 3
  • Cooling Tower Pedestal 2
  • Chain Link and Screen

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×