Skip to main content

Reply to "Continuing Saga …"

Thank you dear followers!

Today, I'm officially turning over the keys to the refinery to Sinclair Oil. There are a few minor punch list items that need doing (signage, landscape around fence posts), but for all intents and purposes the refinery is complete.

I finished drilling the remaining holes for the right end fenceposts and decided to inject Gorilla Glue into the enlarged post holes using a syringe. The glue expands as it cures so it fills up the space securing the fence. I put a board across the far end since it was trying to pop up. Then I decided, before gluing in the left end around the parking lot to check clearances since the fence terminates into the interior of a curve. Boy! Am I glad I did that. My favorite clearance test car is an MTH auto rack. It hit the fence!

Refinery Fence Clear Problem

I was able to stress the next bend and pull the end away on an angle. I then tested this fit with five different locomotives: all of the big steamers and some of the ungainly diesels. The fix cleared okay in all cases, so I was able to glue that end in place.

Refinery Fence Clear 2Refinery Fence Clear Fix 1

After the fence was sitting well, I connected up the parking lot lights, and added all the missing ballast. It was a challenge to get it on the far side of the loading rack, but I persisted. I used a squeeze bottle to carefully apply "wet water" (Isopropyl Alcohol/water mix) and then dribbled W-S scenic cement directly from the squeeze bottle in comes in. As a reminder, I use roofing granules for ballast. It's just about the perfect scale size to 1:1 ballast on the Norfolk-Southern RR.

Refinery Ballast Repair 1

Here's that piece of 1:1 scale lumber holding down the fence's far end until it cures. In these pictures I've just added the glue which is why the gravel is wet.

Refinery Ballast Repair 2

Looks nice now that the M.O.W guys got their jobs done. This "road to nowhere" should eventually end up at a B.T.S grain elevator. Landscaping back there over the refinery is going to be...let us say... challenging. Like maybe I should have put that road and additional RR crossing in before building the refinery.

Refinery Ballast Repair 3

Last thing I did was add another carefully applied coat of Jungle Green paint to finish up the fascia boards. Sometime in the distant future, I'm going to have curtains made to hid all the rest of the benchwork. That will look very spiffy.

So... the refinery is done! Here's some iPhone pics I took from various angles and lighting. I'm going to take some beauty shots with the Canon EOS to submit to various places for publication. The project started in April and finished Cath the end of November... an 8-month endeavor, the results of which I think are worth it.

Refinery Compelte 4

There's an Engelhard car in this picture. I worked there for 8 years. They no longer exist being absorbed by BASF. That's a Kaolin car used to haul that ultra white clay that is used in paint and making paper whiter. It would not get product from the refinery. Although Engelhard was a huge producer of zeolite petroleum catalyst used in catalytic reformers, I do not have such an operation in my chemical plant.

Refinery Complete 1Refinery Complete 3

Grain Elevator will go in that wide between-track space. The RR Crossing has to traverse that long connecting track and it's all right adjacent to the refinery... Ugh! I really think I should invest in a MicroMark topside creeper to reach over the refinery.

Refinery Complete 6Refinery Complete 8

And here's at night...

Refinery Complete Night 1Refinery Complete Night 2Refinery Complete Night 4Refinery Complete Night 6Refinery Complete Night 7

Tomorrow, the Gorilla Glue will be fully cured and will probably need a little trimming/cleanup, plus i'll do some weed placement around the post bases. I also have some chemical plant signage that I want to print out on hi-res photo paper and make some placards to go at strategic spots throughout the plant. I need to get/modify/make some humans to populate this facility. And then it will be truly done.

So what are the takeaways from this one? First of all thanks to all the supporters who encouraged me and fed me ideas, suggestions and techniques. 

  1. While Plastruct kits look cool, they are a bear to complete for several reasons: terrible instructions, difficulty keeping butyrate tubing together with solvent cement, incorrect quantities of materials, lack of details necessary to make an actual working facility, etc.
  2. Breakthrough was when I realized I could flip the design and have the piping on the aisle way so I could pipe the model while on the layout
  3. Found out there was a website that could help you design transition cones of any size... thanks to one of the readers for that one.
  4. Perfected mass-producing utility lighting.
  5. Perfected making and installing chain link fencing in ridiculous lengths.
  6. Designing an ops building to fit a small space.
  7. Further extending the envelop on my scratch-building skills.
  8. Designing and building a free-lance, believable flare tower with air craft warning lights.
  9. Building a cooling tower from a single picture on a website again using SketchUp and Illustrator to create an O'scale drawing set.
  10. Finding out that you can get enough bridal tulle to build a 10 foot model chain link fence for $0.70 at JoAnn Fabrics. The single cheapest hobby purchase I've made in decades.

I actually ran some trains today to move the various locos into position to test the fence clearances. It's been a long time since they were running and some of them showed it, both with some depleted batteries on the engines that don't have BTRs and running on dirty track, but they did run.

I think the next project will be the Bronx building only because I've got that nifty 3-D details. I'm waiting to hear from Andre Garcia as to when we can schedule the laser cutting. The backlog list is long and we have some years of work left.

Also, I want to finish that Fairlane GTA...

Attachments

Images (16)
  • Refinery Fence Clear Problem
  • Refinery Fence Clear 2
  • Refinery Fence Clear Fix 1
  • Refinery Ballast Repair 1
  • Refinery Ballast Repair 2
  • Refinery Ballast Repair 3
  • Refinery Compelte 4
  • Refinery Complete 1
  • Refinery Complete 3
  • Refinery Complete 6
  • Refinery Complete 8
  • Refinery Complete Night 1
  • Refinery Complete Night 2
  • Refinery Complete Night 4
  • Refinery Complete Night 6
  • Refinery Complete Night 7
Last edited by Trainman2001

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×