I was playing around with SketchUp and Podium rendering various views. I still haven't finalized how I'm going to build all the layers of millwork on the outside of the big window.
Spent time at the hobby shop today so I only worked a little over 1 hour, but got the flooring down and started sheathing the perimeter interior walls which need to be done before I drop in the partition walls. I had to seam the flooring to fill the whole space. I fastened the image down with MicroMark pressure sensitive adhesive.
I'm using thin styrene, 0.010" to simulate dry wall. I have more 1/8" square stock packing out the framing and giving a surface to glue to.
Because of the floor ledges, it necessitates doing the walls like a real building with sheet rock going on one floor at a time. The only area that doesn't quite work is where I used 1/4" square stock as corner reinforcement that is fatter than the rest of the wall framing. One can imagine that it a pipe chase going to the second floor.
On Monday I will continue with these wall. I will have to mask the flooring when I paint the walls.