Thanks Mark!

A snowy Saturday with nothing on TV but golf and my wonderful wife said I should go down and play in the basement. So play I did and got the main windows built and installed.

The windows are a tad undersized and needed some support to hold them in the openings. I put a stop of 1/8" styrene that was flush with the back edge of the opening held with thick CA, and then put a curved stop on the top front since the windows weren't reaching all the way to the top of the opening. When the eyebrows are on this piece really finishes up the space nicely. I also played with adding some side shims. I used 0.188" X 0.015" strip to shim it. I tried both sides, but it was too much so I just put it on one side. Then I found as I was actually installing the windows that even one shim was too much. 0.010" stock would have been better. It's very hard to laser cut the windows and their respective openings to get the fit just right. In addition to the .005" kerf left by the laser (about .0025" per side of the cut line), there's the variability of my assembly of the 5 components that make up the windows.

It's always a challenge gluing styrene to MDF. CA doesn't always like styrene, unless it's not where you want it, and MDF is friable, and the part comes loose by the MDF flaking. It took a couple of tries in some of these to get them to stay.

BB Main Window Prep 

I made 8 windows only needing 7 and I'm glad I did since one broke in half when trying to get into the now-tight opening. Did I say the windows were fragile… I have a problem with keeping all kinds of crap off the windows. Between the pressure sensitive adhesive getting on it (removable with Goo Gone), and the thick CA, which was too thick, streaming little strings that settled on the windows (of course) and this is not removable with anything. I suppose I could have changed out the glazing, but I didn't feel like it. I can still do it if I inclined.

BB Main Windows

So all the windows are now in. I glued them in like I did on the first floor using Henkel Pritt Urethane glue. It's forgiving since it stays somewhat flexible. It will cure until Monday when I get back to it. Notice that I put that thick lintel on the windows that I mentioned yesterday. I also notice that I didn't put one on the last window on the right side wall.

BB Main Windows Front inBB Main Windows Side in

On Monday, I'll reinstall the interior and get the front window assembly work done. There's a trim panel that covers the bricks on the left side of the front and that gets some 3D printed ornamentation. It's a much simpler deal than the other trim. Then it's onto the upper reaches. This project should be completed in a couple of weeks working at the pace I've been working. Since the Afib, I haven't been exercising which is giving me more time in the shop. I'm due to meet with the cardiologist next Thursday and then we'll schedule the cadioversion procedure that hopefully will get me firing on all cylinders. I was happy that the tests showed no cardiac circulation problems.

 

 

Attachments

Images (4)
  • BB Main Window Prep
  • BB Main Windows
  • BB Main Windows Front in
  • BB Main Windows Side in
Last edited by Trainman2001