Skip to main content

Reply to "Converting 2 rail Atlas code 148 turnouts to 3 rail.... DONE !Operational sucess at last!!!"

I painted the N scale rail with black Neo Lube because it is electrically conductive and this switch will be part of a cindered yard.

Next I begin to rough up the ends of the tiles with a mill and a razor saw. I like close ups so want the ties to look old. Here one can see the effect

before paint.

Have to run to lows to get some paint for the ties and rails.turn out weather 1

Attachments

Images (1)
  • turn out weather 1

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×