Sorry for the confusion folks, I forgot I made changes after the plan was drawn (using the old Atlas software which I can’t get to work anymore).
My purpose is I want to try to get more distance between the switch (that you see just to the bottom of that horizontal black bar [wall]) and the switch going to the Portsmouth Lumber Company. I need more track there or I have to do a run around or leave part of the train on the mainline when switching. I may have to take out the siding going to the Seaboard Team track but that is a last resort.
It never occurred to me that a curved switch may be too long, I hate it when that happens!