Skip to main content

Reply to "Dad's Layout Changed (23 Nov 2020)"

Well, we got the power busses to the tracks and everything works.  All the Marx turnouts have been wired and work.  Working on a bridge for the walk through.  It is 30 5/8 inches, so I'm thinking maybe two truss bridges together would work.  No new pictures as nothing on top has changed much.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×