DanssuperO posted:Its been a coming... I made my buildings and have all the track to finish many switches will be on this , Two train operation , I just repaint the attic and built the bench work. Next is the top to finish and the bottom I will enclose the front with drywall and paint to match the room
I am making a L shape layout this time and using old school tubular track. the design of the layout is from one of the forum member than was kind to print out I made it into a L otherwise its the same except longer.If you look at my post you will see his design I will make .
Every other layout I had in the basement was the same bench work I used 3/8 plywood and used homosote but I 'm not sure if they sell it at lowes or busy beaver or home depot
Would the 1/2 inch green or pink insulation board the new stuff be Ok.. On top of the plywood
looks very solid. If you use plywood, I'm sure that you be able to stand on it.