Skip to main content

Reply to "Daniel's Attic Layout has begun ..."

Got a chance to install the plywood   installed the side  lower drywall. trim around the top made the  shelf to hold all the buttons and switch  controllers.. sanding  and painting and lower moldings next .. after shower and bed... thumbnail_0112191937athumbnail_0112191938thumbnail_0112191939  Daniel

 

 

Attachments

Images (3)
  • thumbnail_0112191937a
  • thumbnail_0112191938
  • thumbnail_0112191939

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×