I just tried adding engines back onto the layout, one at a time. I now have 3 on the layout and no issues with track signal strength, all 10 and no unwanted start ups. I may add one more, but 4 will be my limit until I can install some toggle switches. I still may run some wires over to the east side of the layout (let me see if I can add the photo now):
Thanks again Barry